[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$f8R7ERUEXWH9c5fh0JmhRAynaLOjREdWjmsWfv26NZrA":3},{"id":4,"slug":5,"title":6,"status":7,"sort_order":8,"is_top":9,"view_count":10,"source":11,"source_site_id":12,"source_url":13,"district":14,"created_at":15,"updated_at":16,"category_id":17,"summary":18,"body":19,"published_at":20,"cover_image":14,"author":14,"source_name":21},56797,"liang-xi-ke-ji-cheng-yi-yuan-yi-ji-di-ge-ju-jia-su-cheng-xing-702d4033dc","梁溪科技城“一园一基地”格局加速成形",1,0,false,12,2,57,"https:\u002F\u002Fjs.news.cn\u002F20260810\u002F6d5d13dd9cde43de95bde231282db87c\u002Fc.html",null,"2026-08-10T10:19:58.837+08:00","2026-08-17T09:49:24.403+08:00",53,"原标题：百日封顶，大型无人机基地年内竣工 梁溪科技城“一园一基地”格局加速成形 为抢占低空经济“新赛道”，梁溪科技城再落关键一子。近日，位于江海西路与青石西路交叉口东北侧的无人机研发集成基地迎来关键节点。随着最后一根钢梁吊装到位，两栋厂房的钢结构主体挺拔矗立，顺利完成钢结构主体封顶，从正式开工到实现这一核心节点，仅用时百余天。 塔吊高耸入云，机械轰鸣作响，走进无人机研发集成基地，处处是抢抓工期的繁忙景象。现场，二次结构砌筑、室内机电安装稳步推进，外立面幕墙龙骨渐次成型，室外市","\u003Cp>原标题：百日封顶，大型无人机基地年内竣工\u003C\u002Fp>\u003Cp>梁溪科技城“一园一基地”格局加速成形\u003C\u002Fp>\u003Cp>为抢占低空经济“新赛道”，梁溪科技城再落关键一子。近日，位于江海西路与青石西路交叉口东北侧的无人机研发集成基地迎来关键节点。随着最后一根钢梁吊装到位，两栋厂房的钢结构主体挺拔矗立，顺利完成钢结构主体封顶，从正式开工到实现这一核心节点，仅用时百余天。\u003C\u002Fp>\u003Cp>塔吊高耸入云，机械轰鸣作响，走进无人机研发集成基地，处处是抢抓工期的繁忙景象。现场，二次结构砌筑、室内机电安装稳步推进，外立面幕墙龙骨渐次成型，室外市政管网不断延伸。据现场负责人介绍，目前项目整体施工进度达59%，楼承板浇筑已全部完成。主体结构的封顶，标志着项目建设正式转入室内外配套施工的新阶段。参建各方正进一步优\u003C\u002Fp>\u003Cp class=\"source-attribution\">信息来源：\u003Ca href=\"https:\u002F\u002Fjs.news.cn\u002F20260810\u002F6d5d13dd9cde43de95bde231282db87c\u002Fc.html\" target=\"_blank\" rel=\"noopener noreferrer\">查看来源原文\u003C\u002Fa>\u003C\u002Fp>","2026-08-10T00:00:00.000+08:00","新华网江苏无锡频道"]